Flexible EV charging plans


Transparent pricing designed for premium and high-value living in Hong Kong.

kWii Premium Private EV-Charging Fee Structure

LISTED PRICES

SUBSCRIPTION PLAN CLASS

Signature Plan (7kW)

Premier Plan (11-22kW)

BASE FEE (FIXED MONTHLY)

$1,000.00

$2,000.00

FACILITY FEE (FIXED MONTHLY ONLY IN 1ST 36 MONTH)

$0.00

$0.00

POWER FEE (PAY-AS-KWH)

PAY-AS-KWH

PAY-AS-KWH

Month Usage (<350 kWh)

$3.20

$3.20

Month Usage (>351 kWh usage)

$3.00

$3.00

Power & Phase (Charger type to be provided)

7kW AC 3-phase

11kW AC 3-phase

EV User subscription period (MONTH)

36 Month

Facility Fee (payable upfront)

$10,000.00

$15,000.00

Subscription Deposit (payable upfront)

$3,000.00

$3,000.00

DLP / Third-Party Insurance / WR 2A

C.A.R. (MATERIAL & LABOR & 3RD PARTY PROPERTIES) $ 20M

Extra Electricity Charge

Usage over 350 kWh in a month, unit rate is further reduced

Contract Period for Location Host (MONTH)

72 Month

Other Special

  • Connectivity service will be available within 2 weeks.

  • Enhanced Wi-Fi enables the system even in low-signal basement.

  • Special discounts and fast installation for group purchases.

  • Electronic credit lines for subscription fees.

  • LMS reduces costs by minimizing cable size and dynamically optimizes power distribution.

  • Members enjoy services across chain parking facilities.

Special Installation Requirements

Outdoor or island parking spaces require special installation, longer lead times, and possibly higher upfront installation deposits.

Remarks

  1. The deployed infrastructure is only sufficient to support an initial 30% coverage rate for Year 1. Coverage will be scaled up gradually as the number of participating users grows.

  2. All prices are subject to the final quotation.

Pay only for the energy you use

Our flexible pricing model means you pay only for the energy you use.

Smart pricing incentives

  • Volume discounts — Reduced electricity rates for higher monthly consumption (auto-tier at 351 kWh).
  • Off-peak rates — Save more by charging during low-demand hours.

Why kWii offers the most transparent EV charging pricing

Unmatched value with no hidden fees or complex pricing structures.

kWii
Other EV charging providers
Pricing model
Clear, usage-based pricing with straightforward terms.
Can involve layered pricing rules that are harder to forecast.
Energy usage
Pay based on actual charging consumption only.
May include bundled assumptions or less transparent breakdowns.
Fees
No hidden fee framing; key costs are presented upfront.
Additional fees can appear across separate service lines.
Support
Managed service with ongoing operational support.
Support scope may vary by package or vendor arrangement.

DLP / Third-Party Insurance / WR 2A — C.A.R. (Material & Labor & 3rd Party Properties) $20M

Contract period for Location Host: 72 months

Prices subject to final quotation.

Remarks & fine print
  • The deployed infrastructure is only sufficient to support an initial 30% coverage rate for Year 1; coverage scales up gradually as participating users grow.
  • All prices are subject to the final quotation.
  • Special installation requirements: outdoor or island parking spaces may require longer lead times and higher upfront installation deposits.

Get a custom quote

Receive a personalized EV charging solution tailored to your specific needs.

Flexible EV charging plans


Transparent pricing designed for premium and high-value living in Hong Kong.

kWii Premium Private EV-Charging Fee Structure

LISTED PRICES

SUBSCRIPTION PLAN CLASS

Signature Plan (7kW)

Premier Plan (11-22kW)

BASE FEE (FIXED MONTHLY)

$1,000.00

$2,000.00

FACILITY FEE (FIXED MONTHLY ONLY IN 1ST 36 MONTH)

$0.00

$0.00

POWER FEE (PAY-AS-KWH)

PAY-AS-KWH

PAY-AS-KWH

Month Usage (<350 kWh)

$3.20

$3.20

Month Usage (>351 kWh usage)

$3.00

$3.00

Power & Phase (Charger type to be provided)

7kW AC 3-phase

11kW AC 3-phase

EV User subscription period (MONTH)

36 Month

Facility Fee (payable upfront)

$10,000.00

$15,000.00

Subscription Deposit (payable upfront)

$3,000.00

$3,000.00

DLP / Third-Party Insurance / WR 2A

C.A.R. (MATERIAL & LABOR & 3RD PARTY PROPERTIES) $ 20M

Extra Electricity Charge

Usage over 350 kWh in a month, unit rate is further reduced

Contract Period for Location Host (MONTH)

72 Month

Other Special

  • Connectivity service will be available within 2 weeks.

  • Enhanced Wi-Fi enables the system even in low-signal basement.

  • Special discounts and fast installation for group purchases.

  • Electronic credit lines for subscription fees.

  • LMS reduces costs by minimizing cable size and dynamically optimizes power distribution.

  • Members enjoy services across chain parking facilities.

Special Installation Requirements

Outdoor or island parking spaces require special installation, longer lead times, and possibly higher upfront installation deposits.

Remarks

  1. The deployed infrastructure is only sufficient to support an initial 30% coverage rate for Year 1. Coverage will be scaled up gradually as the number of participating users grows.

  2. All prices are subject to the final quotation.

Pay only for the energy you use

Our flexible pricing model means you pay only for the energy you use.

Smart pricing incentives

  • Volume discounts — Reduced electricity rates for higher monthly consumption (auto-tier at 351 kWh).
  • Off-peak rates — Save more by charging during low-demand hours.

Why kWii offers the most transparent EV charging pricing

Unmatched value with no hidden fees or complex pricing structures.

kWii
Other EV charging providers
Pricing model
Clear, usage-based pricing with straightforward terms.
Can involve layered pricing rules that are harder to forecast.
Energy usage
Pay based on actual charging consumption only.
May include bundled assumptions or less transparent breakdowns.
Fees
No hidden fee framing; key costs are presented upfront.
Additional fees can appear across separate service lines.
Support
Managed service with ongoing operational support.
Support scope may vary by package or vendor arrangement.

DLP / Third-Party Insurance / WR 2A — C.A.R. (Material & Labor & 3rd Party Properties) $20M

Contract period for Location Host: 72 months

Prices subject to final quotation.

Remarks & fine print
  • The deployed infrastructure is only sufficient to support an initial 30% coverage rate for Year 1; coverage scales up gradually as participating users grow.
  • All prices are subject to the final quotation.
  • Special installation requirements: outdoor or island parking spaces may require longer lead times and higher upfront installation deposits.

Get a custom quote

Receive a personalized EV charging solution tailored to your specific needs.

Flexible EV charging plans


Transparent pricing designed for premium and high-value living in Hong Kong.

kWii Premium Private EV-Charging Fee Structure

LISTED PRICES

SUBSCRIPTION PLAN CLASS

Signature Plan (7kW)

Premier Plan (11-22kW)

BASE FEE (FIXED MONTHLY)

$1,000.00

$2,000.00

FACILITY FEE (FIXED MONTHLY ONLY IN 1ST 36 MONTH)

$0.00

$0.00

POWER FEE (PAY-AS-KWH)

PAY-AS-KWH

PAY-AS-KWH

Month Usage (<350 kWh)

$3.20

$3.20

Month Usage (>351 kWh usage)

$3.00

$3.00

Power & Phase (Charger type to be provided)

7kW AC 3-phase

11kW AC 3-phase

EV User subscription period (MONTH)

36 Month

Facility Fee (payable upfront)

$10,000.00

$15,000.00

Subscription Deposit (payable upfront)

$3,000.00

$3,000.00

DLP / Third-Party Insurance / WR 2A

C.A.R. (MATERIAL & LABOR & 3RD PARTY PROPERTIES) $ 20M

Extra Electricity Charge

Usage over 350 kWh in a month, unit rate is further reduced

Contract Period for Location Host (MONTH)

72 Month

Other Special

  • Connectivity service will be available within 2 weeks.

  • Enhanced Wi-Fi enables the system even in low-signal basement.

  • Special discounts and fast installation for group purchases.

  • Electronic credit lines for subscription fees.

  • LMS reduces costs by minimizing cable size and dynamically optimizes power distribution.

  • Members enjoy services across chain parking facilities.

Special Installation Requirements

Outdoor or island parking spaces require special installation, longer lead times, and possibly higher upfront installation deposits.

Remarks

  1. The deployed infrastructure is only sufficient to support an initial 30% coverage rate for Year 1. Coverage will be scaled up gradually as the number of participating users grows.

  2. All prices are subject to the final quotation.

Pay only for the energy you use

Our flexible pricing model means you pay only for the energy you use.

Smart pricing incentives

  • Volume discounts — Reduced electricity rates for higher monthly consumption (auto-tier at 351 kWh).
  • Off-peak rates — Save more by charging during low-demand hours.

Why kWii offers the most transparent EV charging pricing

Unmatched value with no hidden fees or complex pricing structures.

kWii
Other EV charging providers
Pricing model
Clear, usage-based pricing with straightforward terms.
Can involve layered pricing rules that are harder to forecast.
Energy usage
Pay based on actual charging consumption only.
May include bundled assumptions or less transparent breakdowns.
Fees
No hidden fee framing; key costs are presented upfront.
Additional fees can appear across separate service lines.
Support
Managed service with ongoing operational support.
Support scope may vary by package or vendor arrangement.

DLP / Third-Party Insurance / WR 2A — C.A.R. (Material & Labor & 3rd Party Properties) $20M

Contract period for Location Host: 72 months

Prices subject to final quotation.

Remarks & fine print
  • The deployed infrastructure is only sufficient to support an initial 30% coverage rate for Year 1; coverage scales up gradually as participating users grow.
  • All prices are subject to the final quotation.
  • Special installation requirements: outdoor or island parking spaces may require longer lead times and higher upfront installation deposits.

Get a custom quote

Receive a personalized EV charging solution tailored to your specific needs.